SmartSupplyAI — The weekly briefing on AI in supply chain and logistics

Iran war disrupts datacenter construction supply chains, raises material costs

· Source: theregister.com

In short

The Iran conflict is significantly impacting datacenter construction supply chains by increasing material costs and causing shortages due to the closure of the Strait of Hormuz. This has led to up to 20% hikes in building material costs and reduced availability, with oil-based materials like steel, aluminum, and cement particularly affected. The situation exacerbates existing challenges in the datacenter construction industry, including delays, energy price inflation, and supply chain volatility.

Read Original Article — Read the full article on the publisher’s site.

In the issue of week 19, 2026: AI-Driven Platforms Boost Resiliency and Efficiency Across Global Supply Chains

Tags: datacenter, supply chain, construction, materials, costs, logistics

Related articles

The weekly briefing on AI in supply chain and logistics: a sourced editorial every Monday, the articles of the week and a podcast.